PSMF Authoring, Review & Maintenance Across Africa

Would Your PSMF Pass an Inspection Today?

An outdated, incomplete, or inaccurate Pharmacovigilance System Master File is one of the most common inspection findings across Africa. Jeyflex provides expert PSMF authoring, regular review, annex maintenance, and local PSMF support, ensuring your PSMF accurately reflects your current pharmacovigilance system and is always ready for regulatory scrutiny.

What is a Pharmacovigilance System Master File (PSMF)?

The Pharmacovigilance System Master File (PSMF) is a mandatory document that provides a comprehensive description of the pharmacovigilance system used by a Marketing Authorization Holder (MAH) for all their medicinal products. It is the primary document that regulatory authorities review during a pharmacovigilance inspection — acting as proof that the MAH has a functioning, compliant system in place.

The PSMF must describe the pharmacovigilance system in its entirety, including:

The Qualified Person for Pharmacovigilance (QPPV) their identity, qualifications, and contact details
The organisational structure and responsibilities of the pharmacovigilance team
Standard Operating Procedures (SOPs) governing all PV activities
Electronic safety database systems and data sources used
The quality management and control systems in place

Jeyflex authors, reviews, and maintains PSMFs that accurately reflect your current pharmacovigilance system and withstand inspection.

Our PSMF Management Process

Every PSMF engagement follows a structured process from initial assessment through to authoring, review cycles, and ongoing maintenance aligned with GVP Module II requirements.

01

PSMF Gap Assessment

We begin with a thorough review of your existing PSMF  or an assessment of what is required if no PSMF exists, against current GVP Module II requirements and the specific expectations of your target African regulatory authorities.

02

PSMF Authoring

We author a complete, GVP Module II-compliant PSMF that covers the main document and all required Annexes (A to I), accurately reflecting your current pharmacovigilance system, organizational structure, QPPV details, SOPs, and electronic systems.

03

Quality Review & Sign-Off

The completed PSMF undergoes a structured quality review to check accuracy, completeness, and alignment with current regulatory requirements before being presented for QPPV sign-off and formal approval.

04

Annex Maintenance

The PSMF Annexes (A to I) must be kept continuously updated to cover the QPPV, delegated tasks, sources of safety data, PV processes, local PV system performance, quality system details, and more. We manage this ongoing maintenance so nothing falls out of date.

05

Ongoing PSMF Updates

Whenever your pharmacovigilance system changes new products, new markets, SOP updates, QPPV changes, or new electronic systems, the PSMF must be updated within 90 days. We monitor your system for triggering changes and update the PSMF accordingly.

06

Local PSMF Support

Several African regulatory authorities require a local PSMF, a country-specific adaptation of the main PSMF reflecting local PV operations, the local safety officer, and market-specific requirements. Jeyflex prepares and maintains both the global and local PSMF across your African markets.

Understanding PSMF Annexes (A to I)

The PSMF Annexes are supplementary documents that provide crucial detailed information required by health authorities. Each annex must be maintained separately and kept up to date independently of the main PSMF document.

Annex A – Information on the QPPV: qualifications, location, contact details, and deputy arrangements
Annex B – Delegation of tasks: third-party contracts and service agreements for outsourced PV activities
Annex C – Sources of safety data: all data sources used for signal detection and case processing
Annex D – Computerised systems and databases used in pharmacovigilance activities
Annexes E–I – PV processes, local performance metrics, quality system, audit records, and product listings

Jeyflex manages all nine annexes — keeping each one current, accurate, and ready for inspection at all times.

Why Choose Jeyflex for PSMF Services?

Pan-African PSMF Expertise

We understand both the global PSMF standard under GVP Module II and the local PSMF requirements of African NRAs — including PPB, NDA, EFDA, RFDA, TMDA, NAFDAC, and SAHPRA.

Continuously Maintained

We monitor your PV system for events that trigger PSMF updates and maintain both the main document and annexes on an ongoing basis — so your PSMF never falls behind your actual operations.

Inspection-Ready at All Times

A PSMF authored and maintained by Jeyflex is structured to withstand regulatory inspection — complete, accurate, and aligned with the current state of your pharmacovigilance system.

ISO 9001:2015 Certified

All PSMF authoring and maintenance activities are conducted under our ISO 9001:2015 certified quality management system — ensuring consistent quality, documented processes, and independent verification.

Integrated with Your Full PV System

The PSMF is the backbone of your PV system documentation. Jeyflex ensures it stays aligned with your SOPs, QPPV arrangements, signal management, PSUR programme, and audit records — all in one coherent document.

Scalable Across Your Portfolio

Whether you have one product in one market or a full portfolio across 16 African markets — we scale our PSMF management services to match your exact scope and complexity.

Our PSMF Services

A complete PSMF service covering initial authoring through to ongoing lifecycle management.

PSMF gap assessment against GVP Module II requirements
Full PSMF authoring from scratch for new MAHs or new markets
Review and update of existing PSMFs to current requirements
Annex A to I preparation, maintenance, and version control
Local PSMF preparation for specific African regulatory authorities
Ongoing PSMF maintenance and 90-day update management
PSMF quality review and pre-inspection audit
QPPV section management and deputy QPPV documentation
SOP listing management and version tracking in PSMF annexes
PSMF archive management in an inspection-ready format

What Happens When Your PSMF is Out of Date?

An outdated PSMF is one of the most frequently cited inspection findings. The consequences are direct and serious:

Critical inspection findings for failure to maintain the PSMF within the 90-day update requirement
Evidence of a non-functioning pharmacovigilance system presented to the regulatory authority
Discrepancies between the PSMF and actual operations — triggering deeper inspection of your entire PV system
Regulatory enforcement actions up to and including suspension of marketing authorisation

Your PSMF must accurately reflect your current pharmacovigilance system at all times — not just at the time it was written.

Frequently Asked Questions

A Pharmacovigilance System Master File (PSMF) is a mandatory document that describes the pharmacovigilance system of a Marketing Authorization Holder (MAH) for all their medicinal products. It is required by regulatory authorities as evidence that the MAH has a functioning, compliant pharmacovigilance system in place. Under GVP Module II, all MAHs operating in markets that follow EMA guidelines are required to maintain a PSMF. An increasing number of African NRAs — including Kenya’s PPB, Uganda’s NDA, Nigeria’s NAFDAC, and South Africa’s SAHPRA — require or expect a PSMF as part of the marketing authorisation conditions.

The PSMF must be updated within 90 days of any significant change to the pharmacovigilance system — including changes to the QPPV, new products, new markets, SOP updates, new or changed electronic systems, or changes to the organisational structure. Additionally, the PSMF Annexes must be kept continuously current as the underlying data changes. Jeyflex monitors your system for triggering changes and manages updates to ensure the 90-day requirement is always met.

The main PSMF is a global document that describes the overall pharmacovigilance system for all products and all markets. A local PSMF — sometimes referred to as a country PSMF or affiliate PSMF — is a market-specific adaptation that describes the local PV arrangements, the local safety officer or LPPV, and any country-specific requirements or operations. Several African regulatory authorities require a local PSMF in addition to the global document. Jeyflex prepares and maintains both.

Yes — and this is one of the most common situations we encounter. We begin with a comprehensive gap assessment comparing your existing PSMF against your current PV operations and current GVP requirements, then produce a remediated PSMF that accurately reflects the present state of your system. We also establish an ongoing maintenance programme to ensure it never falls behind again.

Yes. This is one of Jeyflex’s core strengths — managing the PSMF and local PSMFs across multiple African markets simultaneously, under a single coordinated engagement. Rather than managing separate PSMF programmes for each country, Jeyflex provides a consolidated service with a single point of accountability for your entire PSMF portfolio.

Ready to Strengthen Your Literature Surveillance?

Whether you need a full ongoing literature monitoring programme or a review of your current surveillance setup, Jeyflex is ready to help.